Ofivio AE, explained: what's in the box, what it costs, and how the product system works
Ofivio moved to a product system: you buy the product for your industry, size it by seats, and add whole dashboards as you grow. Here is exactly how that works for an architecture or engineering practice.
Ofivio used to be one subscription. In 2026 it became a product system: six products on one spine, each shaped around an industry, each priced by team size, each able to buy the dashboards it does not already include. Ofivio AE is the flagship of that system — the product built for architecture and engineering practices — and this guide walks through all of it: the box, the packages, the add-ons, VO, and the ceiling.

The idea: buy a product, not a bundle of features
Most software prices by feature matrix — eighty rows of ticks and crosses that nobody reads. Ofivio prices on three axes that never overlap. The PRODUCT says which industry you are in. The PACKAGE says how many people you are — seats and storage, nothing else. The DASHBOARD is the add-on unit: a whole department's workspace, never a single function sold back to you piecemeal.
- Product — Ofivio AE for design practices, Ofivio Build for contractors, Ofivio Real Estate for property, Ofivio Finance for accounting firms, Ofivio HR for people management.
- Package — Solo (up to 5 seats), Business (up to 25), Enterprise (unlimited, quoted). Packages differ by seats and storage only.
- Dashboard add-ons — a whole dashboard at one flat price, identical in every product.
- VO — the AI officer, priced per seat, in three tiers.
What's in the Ofivio AE box
Ofivio AE ships five dashboards in the base price, plus the two every Ofivio product includes free. The base is $35/month for a solo practice and $250/month for a business band, before any add-ons.
| Dashboard | What it does |
|---|---|
| Ofivio Studio | Eleven design stages, drawing sets by discipline, revisions, transmittals, delivery desk. |
| Ofivio Manager | Tasks, approvals, milestones, workload and delivery tracking. |
| Ofivio BOQ | Bill of quantities, volume groups, rate library, Excel import, cost analysis. |
| Ofivio Site | Daily progress, site photos, snag lists, labour and material-on-site logs. |
| Ofivio People | Payroll runs, salary structures, advances, warnings and staff letters. |
| Ofivio HR (free, universal) | Employees, departments, teams, tasking, attendance and leave. |
| Ofivio Finance (free, universal) | Invoices, expenses, budgets, wallets, milestone cash, receivables. |
The spine underneath is what makes it one product rather than five tools: a drawing produced in Studio belongs to a stage, the stage belongs to a project, the BOQ lines belong to the same project, the site report references the same drawings, and the fee milestones post into the same books. Nothing is exported from one module and re-imported into the next.
The design spine: eleven stages, sets by discipline
AE's core is the design spine — eleven design stages from concept to handover, with drawing sets organised by discipline, each set carrying its own revisions, transmittals and BOQ. If you have worked to the RIBA Plan of Work, the shape is familiar; the difference is that here the stages are live objects your drawings, approvals and fees actually attach to, not headings in a fee proposal.

Add-ons: whole dashboards, one price each
A practice that starts procurement work adds Ofivio Procurement ($15/mo solo, $60/mo business). A firm that runs its own store room adds Ofivio Warehouse. Double-entry books come with Ofivio Accounting. Every add-on is the entire dashboard — the same one a native product ships — never a cut-down version.
VO — the AI officer, per seat
Every seat gets VO Assist free — text chat over everything that seat is allowed to see, with a daily token allowance. VO Voice ($4/seat solo, $6/seat business) adds speech in and out, including Urdu, hands-free on mobile. VO Officer ($8/$12 per seat) executes work: drafts, tasks, approvals, watchers, a daily briefing and long-term memory. Read the full breakdown on the VO page.
One design decision worth knowing before you buy: when a seat's daily allowance runs out, VO pauses rather than bills. There is no surprise invoice at the end of the month — the meter is a daily token budget, and hitting it is an upgrade prompt, not a charge.
The ceiling: where the bill stops
Your bill is base + dashboards + VO — and it is hard-capped at $100/month on Solo and $500/month on Business. At the cap, everything unlocks: every dashboard, in every corner of the platform. Ofivio calls that Complete. In practice it means the worst case is known before you start, and a growing firm converts itself at a price it already accepted.
What AE costs in practice
| Firm | Configuration | Monthly |
|---|---|---|
| 2-partner studio | AE Solo base | $35 |
| 12-person practice | AE Business + Ofivio Accounting | $300 |
| 20-person design-build firm, VO Officer on 20 seats | AE Business + several dashboards + VO | $500 — the ceiling; everything unlocks |
Every Ofivio product also includes the Ofiverse — portfolio, blog, store, the consultant marketplace, training and Viordo — at no extra cost, on every package. Details on the Ofiverse page.
Price your own configuration — product, seats, dashboards and VO — and see exactly where the ceiling is.
Open the package builderRelated reading
What is Ofivio? One spine, six products, explained in five minutes
Ofivio (that's O-F-I-V-I-O — not "oficio") is a software platform for project-driven businesses, built in Pakistan and used by design practices, contractors and the firms around them. This is the five-minute map of what it is and how the pieces fit.
Ofivio Build, explained: construction management on the product system
Ofivio Build is the construction product on the Ofivio spine: the BOQ is the backbone, and procurement, warehouse and site reporting hang off it. Here is what's in the box and how the pricing works.
The best architectural practice management software in 2026
Most 'best software for architects' lists compare marketing pages. This one compares the five things that actually determine whether a tool fits an architecture practice — and is honest about which practices we're the wrong answer for.