Ofivio Planning & QS, explained: the bill as a live object
A bill of quantities is the most re-used document on a project and the least respected one in software: priced in Excel, sent as a PDF, re-typed into an order, measured against by hand.
Ofivio Planning & QS exists because of one observation: on most projects the bill is authored once and re-typed four times. It is priced in a spreadsheet, issued as a PDF, keyed into purchase orders, and measured against at certification from a different set of numbers. Each transcription is where the figures stop agreeing, and they always do.
What makes a bill usable rather than merely present
- Structured lines with quantity, unit and rate — addressable objects, not cells
- Volume groups, so a repeated element is measured once and applied many times
- A rate library that carries forward between projects instead of dying with the file
- Rate analysis that shows what a rate is made of — labour, material, plant, margin
- A direct path from a bill line to a purchase order, with no re-keying
- Measurement against the same lines at certification
Volume groups save the week
A tower with forty similar floors is not forty measurements. Grouping the repeated volume once and applying it is how take-off stops being transcription — and, more importantly, how a change to that element updates everywhere rather than in thirty-nine places minus the one you missed.
The bill is the spine of the money
It prices the tender, it becomes the purchase orders that buy the work, it is what work in place is measured against for the interim certificate, and it is where variation gets argued. That last one is why history matters: a variation is an argument in advance, and it is won by whoever can produce the original line, the instruction, the measurement and the rate build-up without a search.
What is in the box
Planning & QS, Manager, People, HR, Finance.
What it does not do
- No on-screen take-off from drawings or PDFs — measurement is entered or imported
- No quantity extraction from a BIM model
- No shipped template for every published standard method of measurement; check yours
- No benchmarking database of market rates — the library is yours, built from your own work
If measurement speed from drawings is your bottleneck, a specialist take-off tool is the better buy and can feed this. If keeping the bill alive and defensible after the tender is your bottleneck, this is the one.
Import one bill, build one rate, and raise a purchase order from a line.
Start free →BOQ software where the bill is data, not a spreadsheet with a nicer border
A native bill of quantities with volume groups, a reusable rate library and a direct line to purchase orders and certificates — not a spreadsheet import.
SolutionsQuantity surveying software for the people who have to defend the number
Take-off, rate analysis, tender pricing, variations and measurement against work in place — the QS desk as a system rather than a folder of spreadsheets.
Buyer's guidesChoosing quantity surveying software you can still defend a year later
Take-off, rate build-ups, tender pricing, variations and valuation — the four categories of QS software, what each optimises for, and who each actually fits.
How to prepare a bill of quantities that survives the site
Every construction project stands on its bill of quantities, and most BOQ problems are baked in on day one. Here is the preparation process that holds up — whoever you are preparing it for.
BOQBOQ software for architects — and why most of it is built for contractors
Search for BOQ software and you mostly find contractor estimating tools. They solve a related but genuinely different problem, which is why they feel wrong in an architect's hands.
GuidesWhat is an IPC? Interim payment certificates for people who have to live with them
Contractors are not paid when work is done — they are paid when work is certified. The IPC is the document that moves the money, and it deserves to be understood precisely.

