NEWOfivio POS is live — sell at the counter, track the stock, reorder before you run out.See what it does →
Industries

Software for engineering consultancies, built around review and issue

Engineering consultancies produce two things: calculations, and the documents that carry them. The calculations happen in specialist software that nobody should try to replace. The documents — issued, reviewed, commented on, superseded, and billed against a fee — are where consultancies lose time, and where almost nothing is purpose-built for them.

What a consultancy has to run

  • 01Projects with a fee, stages and deliverables owed to a lead consultant
  • 02Technical review as a recorded step, with comments and a resolution
  • 03Drawing and document issue with a transmittal record
  • 04Staff time and cost against the fee, before the project ends
  • 05Coordination with the architect and the contractor without email archaeology
  • 06Invoicing tied to stages, and a ledger that reflects it

Review is the deliverable nobody models

For a consultancy, the review comment is as much an output as the drawing. It has an author, a severity, a response and a close-out — and when it lives in a PDF markup or an email chain, closing it out becomes an afternoon of searching. Making review a first-class record is the single biggest change most consultancies can make.

The consultancy sits between two other firms

You receive from the architect and issue to the contractor, or the reverse. That means your document control has to be defensible to people who do not use your system — which is what a transmittal record is for. See drawing management.

What it does not do

Ofivio Engineering is the delivery and commercial side of the practice. It does not run structural analysis, load calculations, MEP sizing or energy modelling, and it should not — those tools are specialised, mature, and correctly separate.

The three fee traps in consultancy work

  • The extended programme. The fee was agreed for a nine-month project now in month twenty. The scope did not change; the calendar did. Without staff cost tracked against the fee, nobody notices until the project closes at a loss.
  • The review that never ends. Comments issued, responded to, re-issued, re-commented. Each round is small; six rounds is a month of somebody’s time that was never priced.
  • The coordination nobody scoped. Sitting between an architect and a contractor produces work that belongs to neither, and it lands on the consultancy by default.

What a consultancy should actually measure

Utilisation says whether people are busy. Cost against fee, per project, says whether being busy was worth it — and a fully booked team delivering under-priced work is a firm losing money efficiently. The second number requires staff to carry a cost, which is why the roster and the project have to be in one system rather than in HR and a spreadsheet.

Who this is not for

If you are on this list, Ofivio is the wrong purchase and we would rather you know now than in month three.

  • Firms looking for analysis, calculation or simulation software
  • Consultancies mandated onto a client's own common data environment
  • Single-discipline sole traders with two projects
  • Anyone needing BIM federation and clash detection

The products behind this

Questions people actually ask

How is this different from the architecture product?
Same spine, different vocabulary and a technical review desk instead of a design studio. Consultancies that also produce architectural work often run both.
Does it integrate with our analysis software?
No. The calculation stays where it is; what Ofivio holds is the document that carries it, its issue record and its review.
Can we track fee against staff cost?
Yes — staff are assigned with a cost, so utilisation against the fee is a number rather than an end-of-project surprise.

Keep reading

Open a workspace and try it on your own work

A free trial with your own projects in it tells you more in an afternoon than any comparison table. Nothing is charged during the trial.